SOFTWARE DEVELOPMENT METHODOLOGIES
|
First step in the software development is:
|
First step "Feasibility Study"
|
Our group of tallented profesionals use their experinces toward first
step that is feasible study. They collect the requirements of the user
their expectations, and arrive at conclusions about the project. With
5-10% deviation in the expectaion a document is prepared to do software
development task.
Second step in the software development is:
|
First Definition Document (FDD) |
Data Flow Diagram (DFD) |
Entity Relationship Diagram (ERD) |
Class Structure Diagram (CSD) |
System Design Document (SDD) |
|
Design Document (DD) |
|
|
Third step in the software development is:
|
Software Development |
Prototyping |
Coding |
Test Plans |
|
|
Fourth step in the software development is:
|
Release
|
Alpha Version |
Beta Version |
Production Version |
|
|
Fifth step in the software development is:
|
Documentation
|
System Manuals |
User Manuals |
Database Administrator Manuals |
|
|
Sixth step in the software development is:
|
Commissioning & Implementation
|
Hardware Installation |
Third Party Software Installation |
Software Installation |
Software & Hardware Installation Report |
Data Preparation |
Data Entry |
Bugs Report |
Rectification of Bugs |
|
Seventh step in the software development is:
|
Trial Runs
|
Run the system parallel to Manual system |
Chech the reports |
Create Bugs Reports |
Rectification of Bugs |
|
Eighth step in the software development is:
|
Final Runs
|
Initail the database for final runs |
Start the final operation |
Create Bugs Report |
Rectification of Bugs Report |
|
Ninth step in the software development is:
|
Warrantee
|
Warrantte is essential part of customer support.
|